Loading
16-Feb-2011 11:46 AM

Emirates could change order for A350XWBs; -900 too small

Emirates President Tim Clark stated the carrier is considering changing the order made with Airbus in Nov-2007 for A350 equipment (WAPA, 15-Feb-2011). The carrier stated it could swap the supply of 70 A350XWB aircraft, of which 50 are A350-900s and 20 A350-1000s, to include only A350-1000s. Mr Clark stated the 290-seat A350-900s are too small for the carrier, with Mr Clark stating the carrier can "no longer tolerate" aircraft with fewer than 300 seats. However, the -1000 is scheduled to enter service after the -900.

Want More News Like This?

CAPA Membership gives you access to all news and analysis on the site, along with access to many areas of our comprehensive databases and toolsets.
Find Out More