Loading

Xiamen Xiang'an International Airport

New Airport
Completion: 6 days ago (30-Nov-2025)
IATA: n/a
ICAO: n/a
City: Xiamen
Country/Territory: China

Capacity

  • Annual (pax):
    • Initial: 45,000,000
    • When completed: 75,000,000
  • Annual (cargo, tonnes):
    • Initial: 750,000
    • When completed: 1,600,000

Dimensions

  • Terminal:
    • 580,000m²
  • Runways:
    • 3,800m
    • 3,600m

Other airports in Xiamen

About

Xiamen Xiang'an International Airport is a planned international airport development project to be constructed on Dadeng Island, Xiangan District, city of Xiamen. The proposed airport is to feature two 3600m runways in the first phase of construction, with the second phase adding a further two runways. Rail connections will also be built simultaneously in order to link the city with the airport. The first phase of Xiamen Xiang'an International Airport is designed to be capable of handling 45 million passengers by 2025, with annual passenger throughput planned to reach 75 million in 2040, after completion of the second phase construction. The airport project is scheduled to complete construction by 2025.


Apr-2024. HAECO Xiamen announced construction of its new aircraft maintenance facility at Xiamen Xiangan Airport is progressing, with works on track to be completed by Nov-2025 and the facility commissioned in 2026. 

Jan-2023. HAECO Xiamen launchedconstruction of its new aircraft maintenance facility at Xiamen Xiangan Airport on 08-Jan-2023. The facility will cover 537,300sqm, including a 292,300sqm construction area and a 284,000sqm apron area. The project will involve the construction of 18 buildings for engineering, engine testing, fuel supply and utilities. The facility will feature 12 maintenance bays for widebody aircraft, six bays for narrowbody aircraft and two separate painting bays. The facility's 'centre-axle' design will connect the hangars and ancillary buildings, facilitating logistics and resource sharing. The new facility will feature solar power, building management systems, lighting controls, water storage, air conditioning systems and wastewater and air treatment, with the goal of achieving LEED-NC gold certification.

Jan-2022. Xiamen Xiangan Airport commenced development works. The airport project will require an estimated investment of CNY62 billion (USD9.8 billion) and is expected to be completed by 2025. Xiamen Xiangan Airport will be equipped...

CAPA Profiles

CAPA Profiles help you identify new business opportunities and make better business decisions, by providing accurate and up-to-date data on airports, airlines, suppliers, investors, MROs, lessors and countries/territories around the world. Each profile offers comprehensive news and analysis, as well as the ability to drill down into data on schedules, capacity share, fleet, traffic, financial results and more.

Become a CAPA Member

Our full profiles are only available to CAPA Members. CAPA Membership provides exclusive access to the information you need to monitor the competitive landscape and guide your organisation towards success.

It’s ideal for industry analysts, managers and executives who need a snapshot of the latest news, analysis and data from our global team, with the ability to export or email PDF reports in one click.

  • 5000+ airports
  • 3000+ airlines
  • 1600+ suppliers
  • 800+ airport investors
  • 250+ countries/territories and regions
  • And more

CAPA Membership also gives you access to a customised selection of more than 1,000 global News Briefs every week, as well as a comprehensive Data Centre, Analysis Reports and Research Publications. You can also choose from our range of premium add-ons, including Route Maps, Fleet Data and more.